Home.Layout.Construction.Buildings.Operation.Electrics.Rolling Stock.Gallery.Exhibition Data.A1 Partworks.
Copyright Robert Else 2010©

Signal Box Diagram used on the control panel

Layout Operation

The railway features fully operation semaphore and ground signals complete with lamp illumination and dummy signal wires, slow acting points with point rodding including operating cranks. The railway also has fully illuminated scratch built buildings.  

The operating day starts with a track inspection using the Wickhams Trolly, then if all is well a typical market weekday working schedule is operated when a variety of rolling stock will be seen performing different duties during the day on the branch line.